Warranty Information

ABB E-mobility is not liable for damages resulting from improper handling, installation, or use, or non-compliance with instructions.

The EVSE (Electric Vehicle Supply Equipment) has the function of fast EV charging and is intended for indoor and outdoor use. It supports multiple charging standards and configurations. Operation involves preparing for commissioning, preparing for use, and starting/stopping charging sessions. Basic maintenance tasks are also covered.

Troubleshooting and error codes

Risk analysis and description Suggested action
Stored energy in components that could generate hazardous discharges. Wait at least 15 minutes after turning off the EVSE and perform the total isolation procedure before working on the internal components of the charger (refer to "9.3. Total de-energization of the EVSE").
Noise pollution due to installation in unsuitable environments or where individuals routinely work and/or animals dwell most of the time. Reassess the environment or the place of installation.
Adverse external climatic conditions, accumulations of rainwater, low temperatures, high humidity, etc. Maintain ambient conditions suitable for the system.
Overheating of components (transformers, accumulators, coils, etc.) which could cause burns. Use suitable PPE. Wait for the parts to cool down before opening the EVSE.
Clogged EVSE cooling slots or systems. Do not block cooling vents or heat sinks.
Inadequate cleaning that: - does not allow adequate air intake for cooling - does not allows the reading of safety labels. Clean the EVSE, labels and installation environment.
The EVSE contains components and circuit boards that are sensitive to electrostatic discharge. Take ESD prevention measures to protect the electronic components during installation and maintenance of the EVSE.
Inadequate training of staff. Ask for supplementary courses.
Incomplete installation, EVSE or its components temporarily mounted. Prevent unauthorized access to the installation area by barricading the area and placing warning signs indicating the condition of the EVSE.
The AC cable, owned by the user, could be damaged (valid only if the AC socket is present on the EVSE). Check the integrity of the cable and connectors before connecting the cable to the EVSE.
Not allowed to place in ATEX environment. Reassess the environment or the place of installation.
Hand/finger crushed into CMS slot of the EVSE when it comes back to resting position The CMS is retracted by its spring towards its resting position. Pay attention and do not put your hand or fingers along the path of CMS, when the CMS is moving, there is risk of injury.