Equipment may experience premature component failure as a result of failure to follow the installation instructions which voids the manufacturer's equipment limited warranty.
Unit Start-Up Procedure:
Safety First: Read safety instructions before operating.
Initial Checks: Smell for gas leaks. Ensure gas valve switch is OFF.
Power Off: Turn off electrical power to the unit.
Wait: Allow five minutes for gas to clear if smelled.
Gas Valve ON: Move gas valve switch to ON.
Power On: Turn on electrical power.
Thermostat Setting: Set thermostat to desired temperature.
Purge Air: Initial start may require repeating steps to purge air from gas line.
Troubleshooting: If unit fails, follow 'Turning Off Gas to Unit' instructions and call a technician.