1. Before you begin: Review safety instructions, unpack equipment, develop a configuration plan, and consider multipath/failover.
2. Mount the enclosures: Securely mount 2U or 5U enclosures in a rack, ensuring proper handling due to weight.
3. Connect to the management network: Connect RJ45 Ethernet cables from each controller to a management network for access to interfaces and notifications.
4. Cable host servers: Connect host servers to the storage system using Fibre Channel, iSCSI, or SAS, either directly or through switches.
5. Connect power cables and power on: Power on network switches, expansion enclosures, the controller enclosure, and host servers in the specified order.
6. Configure the storage system: Access the storage system via a web browser using the provided IP address, set up a username and password, and perform firmware updates.
7. Perform host setup: Configure host HBAs or network adapters, assign IP addresses, and run the Host Setup Wizard for different host operating systems (Windows, Linux, VMware ESXi).