Installation Guide for Two-Post Rail Kit

Installation Guide for Two-Post Rail Kit

Brand: Dell

Category: Networking Hardware

Document Type: Installation Guide

Language: EN

Available Languages: EN , ES

Uploaded: Nov. 21, 2025, 7:23 p.m.

Manual Publish Date: 2009-06-01

Warranty Information

Information in this document is subject to change without notice.

1. Position the rails: Select proper holes in the rail and position the cabinet at the desired rack location. Rails should be at the bottom of the 4U space for UPS or 3U for EBM. Position L and R ends inward.
2. Attach the rails to the rack: Adjust rail flanges to fit outside the C-shaped vertical rail. Secure with supplied #12-24 Phillips®-head screws. Use bottom holes for the front and second/fourth holes for the back. Use square nuts for square holes if needed. Refer to UPS documentation for UPS installation.
Privacy Policy